High School in Urbino

COMPETITION ENTRY – THIRD PRIZE
HIGH SCHOOL, URBINO 2020

Design team:
2A+P/A (Gianfranco Bombaci, Matteo Costanzo)
LGSMA (Luca Galofaro, Stefania Manna)
Engeneering:
Incide Engeneering
Prof. Ing. Andrea dall’Asta
Model:
Modelab – Marco Galofaro

The architectural concept is to replace the existing building with a compact structure that does not develop its volume vertically but horizontally, in order to seamlessly integrate with the surrounding context and landscape.
Internally, the proposed solution is aimed at creating a high-quality intervention for the entire school complex. The classroom, laboratories, auditorium, and common areas are organically integrated into a structure that is both architecturally and technically innovative. This integration is done in a way that appropriately places them within the surrounding environmental system, allowing for a straightforward use of the building